I was helping a client last year after working with the departmental transformation leader who was sceptical about how the lean and agile approaches can help the department to improve. He set me a challenge to work with one of their teams.
Photo by Bruno Nascimento on Unsplash
I didn’t know that he picked their most agile team and the director of that team had even less interest in engaging and learning as he was very successful and his team was too. This reminded me of Chris Argyris work and this HBR article Teaching Smart People How To Learn.
I interviewed the people in his team face to face and over the phone as we were geographically dispersed across three different time zones. This team developed analysis engine. During the interviews, the code review kept coming up as a key source of dissatisfaction.
After observing and studying the system of work and capturing and presenting my observations we agreed to build our Improvement Board (based on Toyota Kata by Mike Rother) to reduce story lead time and increase the delivery rate.
Use Improvement Board to highlight the problem and carry out experiments to tackle the sources of delay.
The results after 3 months:
- The story lead time reduced from 22 days to 10
- Code review time reduced from 11 days to (1 to 3) days
- Delivery rate increased by 30%
- Failure demand reduced by 10%
- Work item ageing for items > 20 days 100%
- items > 10 days reduced by 90%
Current State
Study the system and gather data about how your current system of work is working in our case it was
- Code review cycle time
- System lead time
- Work item ageing
- Static code analysis measures
- Failure demand
- Delivery rate
Target State:
A baby step towards achieving the optimising goal
Timeboxed
Experiment:
Choose one of the obstacles to tackle
An experiment to tackle the obstacle, note the expected results
Carry out the experiment
What actually happened, what did you learn?
The next experiment is guided by the learning from the last experiment
Obstacles:
List of the obstacles in the way of achieving the optimising goal
Tackle the obstacles one at the time
Want to know more about Toyota Kata
The below is the list of our obstacles
- Scheduling of code reviews
- Reviewers being overloaded with multiple code review requests
- Code of low quality
- Reviewers be pedantic
- work item ageing
The results after 3 months:
- The story lead time reduced from 22 days to 10
- Code review time reduced from 11 days to (1 to 3) days
- Delivery rate increased by 30%
- Failure demand reduced by 10%
- Work item ageing for items > 20 days 100%
- items > 10 days reduced by 90%